PLAN YOUR HIRE ↗
07
EQUIPMENT & SERVICES / AUSTRALIA

Power Generation Hire

Power Generation Hire connects equipment capability with operators, mobilisation, site conditions and the support services around the work.

Category planning notes

Prepare your power generation hire enquiry.

Give the supplier a load schedule and explain which loads are critical. Qualified electrical personnel should assess connections and the proposed installation.

  • Load list and starting pattern
  • Distribution and connection requirements
  • Fuel, service access and interruption consequences
Equipment selection / A working brief

Build a load schedule before requesting a generator

List each load, its rated information and when it operates. Tell the supplier which items start together and what happens if power is interrupted. Generator selection must account for the load profile; adding the running figures alone can miss starting demand.

Turn the job requirement into information a supplier can assess.
DecisionInformation to sendAnswer to retain
Loads with starting demandProvide nameplate and starting information rather than guessing a multiplier.An assessed starting and running load schedule.
Several operating periodsShow which loads overlap and which are intermittent.The assumed operating profile used in the proposal.
Connections and distributionGive the responsible electrical personnel the equipment and site information.An assessed connection and distribution arrangement.
Critical continuous workDescribe the consequence of interruption and the required operating period.Fuel, monitoring, service and continuity responsibilities.

Work through the sequence

A hire starts with lighting and later adds a motor-driven load. Send the updated schedule before the second stage. Spare sockets do not demonstrate spare generating capacity, and an unchanged hire duration does not mean unchanged fuel demand.

Your enquiry pack

  • Load names and electrical data
  • Starting sequence and simultaneous operating periods
  • Location, environment and installation assessment
  • Run-time expectations and fuel/service access

Technical reference: Atlas Copco Rental · Generator selection inputs ↗. Reviewed 24 September 2026. The reference supports selection principles; our example and enquiry checklist are editorial planning aids, not a machine specification.

Turn these inputs into an enquiry →
CONNECTION CONTROLS

Plan the work between teams.

H01Scope → allocation↗H02Depot → site↗H03Machine → operator↗H04Day → night shift↗H05Production → support↗H06Breakdown → response↗

Plan each stage of the hire.

01Scope the work↗02Prepare the site↗03Move material↗04Lift and build↗05Support the shift↗06Finish and hand back↗
PROVIDERS IN THIS CATEGORY

Find providers to contact.

Category associations are broad. Confirm exact equipment and capability for your project.

AU

Adelaide Hire

Base not recorded

VIEW PROFILE ↗
AU

Alice Equipment Hire

Base not recorded

VIEW PROFILE ↗
AU

Asset Construction Hire

Base not recorded

VIEW PROFILE ↗
AU

Coates

Base not recorded

VIEW PROFILE ↗
AU

Ezyquip

Base not recorded

VIEW PROFILE ↗
AU

Flexihire

Base not recorded

VIEW PROFILE ↗
AU

Gaamben

Base not recorded

VIEW PROFILE ↗
AU

Hannant Plant Hire

Base not recorded

VIEW PROFILE ↗
AU

Hire Power NT

Base not recorded

VIEW PROFILE ↗
AU

Hireworks NT

Base not recorded

VIEW PROFILE ↗
AU

Hobart Plant Hire

Base not recorded

VIEW PROFILE ↗
AU

Kennards Hire

Base not recorded

VIEW PROFILE ↗
AU

Master Hire

Base not recorded

VIEW PROFILE ↗
AU

Onsite Rental Group

Base not recorded

VIEW PROFILE ↗
AU

PremiAir Hire

Base not recorded

VIEW PROFILE ↗
AU

Renteca

Base not recorded

VIEW PROFILE ↗
AU

RPM Hire

Base not recorded

VIEW PROFILE ↗
AU

Tutt Bryant Hire

Base not recorded

VIEW PROFILE ↗
AU

W.E.S.S.

Base not recorded

VIEW PROFILE ↗
Clear answers

Power Generation Hire: booking questions

Can I size a generator from total running power?

Running power alone may not represent starting demand or the load profile. Give the supplier the equipment data and operating sequence and have the installation assessed by responsible electrical personnel.

What should be included with the generator quote?

Ask for the proposed unit, the assessed loads, distribution scope, delivery, fuel basis, servicing and the response arrangement. State who supplies and connects each part.

What information helps suppliers quote for power generation hire?

Provide the task, quantities or dimensions, site address, access constraints, dates and shift hours. Specify operator, attachment and transport requirements so each proposal covers the same scope.

Are these providers available in my area?

These records are associated with the service category. Confirm actual equipment, service coverage and availability directly for the project location and dates.

What should I check beyond the hire rate?

Check delivery and collection, minimum hours, included attachments, fuel, standby, breakdown support and the off-hire notice process. Ask the provider to put inclusions in writing.

Browse and compare all providers in this category →
The fieldbook

Make the next decision with confidence.

Explore all 15 planning guides →